re: Nicholson and Brightside construction question

Posted on 4/29/19 at 12:32 pm to
Posted by CrawKing
Member since Mar 2018
180 posts
Posted on 4/29/19 at 12:32 pm to
I believe it was scheduled for july, 2018 to July 2019. We have had a ton of rain so I assume that will be pushed back. I am actually impressed with the design on DOTD site.
Posted by ksdolfan
Houma, La.
Member since Sep 2007
1544 posts
Posted on 4/29/19 at 2:32 pm to
quote:

I am actually impressed with the design on DOTD site.


Link please because I cannot find it.