- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
Anyone in Lafayette know why they are redoing the same
Posted on 2/2/17 at 3:02 pm
Posted on 2/2/17 at 3:02 pm
Stretch of camellia blvd that they just redid 6 months ago? What a pain in the arse.
Posted on 2/2/17 at 3:02 pm to GonePecan
Gotta use up that taxpayer money one way or the other
Posted on 2/2/17 at 3:03 pm to GonePecan
Also love the speed camera van they move around Camellia every day
frick em
frick em
Posted on 2/2/17 at 3:03 pm to GonePecan
Because it is lafayette and it is imperative that they make sure that traffic is fricked up.
Posted on 2/2/17 at 3:04 pm to GonePecan
It's just Lafayette, they just figured out civil engineering and road construction. Going be a few bumps before they get up to the rest of the world.
Posted on 2/2/17 at 3:07 pm to Cosmo
quote:
Also love the speed camera van they move around Camellia every day
That pos.
Posted on 2/2/17 at 3:15 pm to GonePecan
When they did the ambassador extension they realized that the lanes weren't wide enough to cars to make u-turns. They then had to come back make a shoulder every where there was crossing. Modern marvels of acadiana.
Posted on 2/2/17 at 3:20 pm to DirtyMikeandtheBoys
Maybe they can send some of their newfound knowledge over to Baton Rouge
Posted on 2/2/17 at 3:23 pm to DirtyMikeandtheBoys
I swear Lafayette has the longest traffic lights in the history of mankind.
Posted on 2/2/17 at 3:25 pm to Winkface
And add to that people playing cell phones at every light and not paying attention. This stalls traffic more than folks care to think about.
Posted on 2/2/17 at 3:40 pm to griddle
Best part was they started this on many roads around town literally the week after thanksgiving. Total cluster for the worst traffic month of the year.
Posted on 2/2/17 at 3:46 pm to GonePecan
Every time I think they are finished they jump to the other side
Posted on 2/2/17 at 3:59 pm to yellowfin
How about Verot School Road with a mini Grand Canyon on either side for what must be over a year now. I've seen at least 5 vehicles over the edge or flipped. Has to be against some kind of public safety law.
Nobody ever seems to be working on it either. Expected completion of the widening project is 2018. fricking clownshow
Nobody ever seems to be working on it either. Expected completion of the widening project is 2018. fricking clownshow
Posted on 2/2/17 at 4:02 pm to G Khan
quote:
How about Verot School Road with a mini Grand Canyon on either side
Well said
Posted on 2/2/17 at 4:02 pm to GonePecan
Poor quality concrete pours
Posted on 2/2/17 at 4:11 pm to G Khan
quote:
How about Verot School Road with a mini Grand Canyon on either side for what must be over a year now. I've seen at least 5 vehicles over the edge or flipped. Has to be against some kind of public safety law. Nobody ever seems to be working on it either. Expected completion of the widening project is 2018. fricking clownshow
THIS!!!!! x1000000
I mean WTF!? They trenched out Grand Canyons on both sides of Verot then haven't did shite for the past year, just left it like that. I haven't even seen anyone working on it in what seems like forever! What a fricken clusterfrick!
Then they just bust up the roads on Ambassador extension and leave it like that. Why don't they finish a frickin project BEFORE starting a new one!!!!!
Posted on 2/2/17 at 4:24 pm to GonePecan
I live off of camellia and can't figure it out for the life of me. I usually leave before they start but it's a huge pain in the afternoon.
Posted on 2/2/17 at 4:31 pm to LSUperior
Because they go with the lowest bidder that doesn't have the size and manpower to do jobs piecemeal. And that's how a lot of the parishes pay for roadwork too. In stages. Rather than, do the job and you'll get paid.
Same thing going on in Baton Rouge metro area too.
Same thing going on in Baton Rouge metro area too.
Posted on 2/2/17 at 4:40 pm to GonePecan
What thermal said.
Previous city parish admin pressured the road contractor to complete the project during their term.
So they cut corners, ignored engineering, and rushed the process - ---knowing full well that the new road would start buckling. It was just a matter of time.
Previous city parish admin pressured the road contractor to complete the project during their term.
So they cut corners, ignored engineering, and rushed the process - ---knowing full well that the new road would start buckling. It was just a matter of time.
Posted on 2/2/17 at 4:57 pm to G Khan
quote:
How about Verot School Road
I never go that far out of town
Popular
Back to top
Follow TigerDroppings for LSU Football News