Started By
Message

re: 18 months of lane closures on the BR Mississippi River Bridge

Posted on 9/8/14 at 3:54 pm to
Posted by MountainTiger
The foot of Mt. Belzoni
Member since Dec 2008
14672 posts
Posted on 9/8/14 at 3:54 pm to
quote:

The capacity of the bridge far exceeds the daily demand.

Same could be said for every highway in the country. Daily demand =/= peak demand.
Posted by Grit-Eating Shin
You're an Idiot
Member since May 2013
8437 posts
Posted on 9/8/14 at 3:57 pm to
quote:

Daily demand =/= peak demand.

Was it really not evident that it was a joke?
Posted by DirtyMikeandtheBoys
Member since May 2011
19430 posts
Posted on 9/8/14 at 3:58 pm to
quote:

Daily congestion demand =/= peak demand


in BR on that bridge it does
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram