re: Nicholson @ Brightside Green Light Project

Posted on 5/14/14 at 1:29 pm to
Posted by Hammertime
Will trade dowsing rod for titties
Member since Jan 2012
43030 posts
Posted on 5/14/14 at 1:29 pm to
I drove on concrete today that was poured Monday
Posted by LSU2NO
Baton Rouge
Member since Oct 2007
1926 posts
Posted on 5/14/14 at 1:34 pm to
quote:

I drove on concrete today that was poured Monday


Quite possible. I tested the emergency road repair on La. 1 @ the Intercoastal Canal at 2 hours and 45 minutes old and it broke at 4880 psi. It had 'Super P' in it.
Posted by KLSU
Baton Rouge
Member since Sep 2003
10366 posts
Posted on 5/14/14 at 1:35 pm to
quote:

Nicholson/brightside is the single worse intersection design in the history if mankind.


MRB I-10 East to I-110 begs to differ.
This post was edited on 5/14/14 at 1:36 pm
Posted by Drop4Loss
Birds Eye Of Deaf Valley
Member since Oct 2007
3885 posts
Posted on 5/14/14 at 1:37 pm to
Boone dont hit College..............
Posted by FenrirTheBeard
NOLA
Member since Jun 2012
6441 posts
Posted on 5/14/14 at 1:59 pm to
quote:

My phone updated itself and acting weird now. But good on you for being a huge bitch and calling out obvious typos. What would we do without you?


So, your phone update robbed you of your proofreading skills?

Posted by CarRamrod
Spurbury, VT
Member since Dec 2006
57524 posts
Posted on 5/14/14 at 2:03 pm to
quote:

Does anyone know the reasons for the continued delays on this project
You have never had to do work with the Rail Road Companies have you?

What ever they say goes, basically no matter what. Other obstacles are the elevation of the RR compared to nicholson and both sides of brightsides. It is going to take some major dough gaining ROW away from Nicholson, to design a big enough intersection needed.
Posted by CarRamrod
Spurbury, VT
Member since Dec 2006
57524 posts
Posted on 5/14/14 at 2:06 pm to
quote:

Nicholson/brightside is the single worse intersection design in the history if mankind.

it was basically a farmers road. then developers decided it would be a great idea to put condos what would house 1000s of people right up against the intersection without any area for redesign.

yea big mistake for that farmer who didnt know it would be servicing 1000s of people 50 years ago.

quote:

boyd/burbank?
ill add this to this post as well. Do you retard really believe that when that intersection was "designed" i say that loosely because i believe Boyd was there way before burbank, that the designers of that 2 lane road that most likey was going to be a neighborhood street would forsee the Condo Boom of the late 2000s? which probably is 4 times the population density as a neighborhood.
This post was edited on 5/14/14 at 2:16 pm
Posted by CarRamrod
Spurbury, VT
Member since Dec 2006
57524 posts
Posted on 5/14/14 at 2:10 pm to
quote:

I think you can drive on it after 7 days, but to fully cure is 28. I don't know if I'm remembering that right from school...I'm not on the construction side of things.

yea i take up for alot of engineering/construction issues, but the Essen debacle is laughable. there has been no work on it for 3 months. you can open a lane less than a week after concrete is poured.
Posted by The Sad Banana
The gate is narrow.
Member since Jul 2008
89498 posts
Posted on 5/14/14 at 2:14 pm to
I was in that area last night and forgot to ride down Staring. It's still not all the way open?
Posted by LoveThatMoney
Who knows where?
Member since Jan 2008
12268 posts
Posted on 5/14/14 at 2:15 pm to
quote:

Does anyone know the reasons for the continued delays on this project.


Louisiana.
Posted by CarRamrod
Spurbury, VT
Member since Dec 2006
57524 posts
Posted on 5/14/14 at 2:17 pm to
quote:

I was in that area last night and forgot to ride down Staring. It's still not all the way open?

yea the 8 million cones are still there. they are literally every 1-2ft. IDK what the contractor is doing. it would take half a day to go out remove the cones and finish striping for that to be done.
Posted by darbour21
baton rouge
Member since Jan 2006
2146 posts
Posted on 5/14/14 at 2:28 pm to
Could be a lot of stuff....

They could have grinds to do on the concrete which means the city hadn't accepted it and the contractor still owns it....

Could be they don't have any grinds and they are keeping it closed so the city gets people like you guys complaining and calling about why it isn't open and they just say screw it and we accept it, just open the road so people quit complaining....
This post was edited on 5/14/14 at 2:31 pm
Posted by kingbob
Sorrento, LA
Member since Nov 2010
67289 posts
Posted on 5/14/14 at 2:35 pm to
They have been saying this since the late 80s. It's never going to happen. They will study it until the costs double and there's no more money in the budget left to build it. Then, they will wait a couple years and study it again. Rinse, repeat, and fleece the taxpayers with more studies and mre empty promises. They could very easily fix that intersection in one night with a can of paint and a trafic light with a left turn arrow. All you have to do is turn the right turn lane into a straight and the straight into a left turn lane and put in a turn signal. They did this on Park at Perkins and it worked to perfection. It's a cheap fix that would only cost a couple hundred dollars and would work in the short term until the road can be widened, but it will NEVER happen. Why? Because government.
Posted by jordan21210
Member since Apr 2009
13417 posts
Posted on 5/14/14 at 2:54 pm to
quote:

Boone dont hit College..............


I meant Lee, apparently. It's all the same shite.
Posted by CarRamrod
Spurbury, VT
Member since Dec 2006
57524 posts
Posted on 5/14/14 at 4:19 pm to
quote:

Could be they don't have any grinds and they are keeping it closed so the city gets people like you guys complaining and calling about why it isn't open and they just say screw it and we accept it, just open the road so people quit complaining....
would you want your name as a contractor tarnish for being a little shite like this? I know i wouldnt.
Posted by CarRamrod
Spurbury, VT
Member since Dec 2006
57524 posts
Posted on 5/14/14 at 4:23 pm to
quote:

nd fleece the taxpayers with more studies and mre empty promises.
You never hear about the studies that save millions of dollars do you. Kinda like good cop stories.

quote:

ey could very easily fix that intersection in one night with a can of paint and a trafic light with a left turn arrow.
you are telling me you want tractor trailers to shift down to a 9-10' lanes with-in a matter of 10 feet?

they usually dont retrofit roads or intersections to a configuration that will lower the level of service. Thats the only thing i can think of.
quote:

Park at Perkins
and Burbank isnt a major thoroughfare for tractor trailers.

quote:

Because government.
not arguing against you there.
This post was edited on 5/14/14 at 4:24 pm
Posted by zbrous4
Gonzales via DeRidder
Member since Aug 2009
448 posts
Posted on 5/14/14 at 5:38 pm to
quote:

Make the "right turn lanes" to "through lanes" and the current "through lanes" into "left turn lanes". BOOM


why they have not done this is beyond me. Why would you have dedicated right turn lane for that intersection?
Posted by Dorothy
Munchkinland
Member since Oct 2008
18153 posts
Posted on 5/14/14 at 6:03 pm to
Staring opened up four lanes yesterday (2 each way), and most of the cones were gone today.

Not sure if it's open all the way to Highland, but it looked like it was 4 lanes all the way from Perkins to Menlo at least.
Posted by biglego
Ask your mom where I been
Member since Nov 2007
76795 posts
Posted on 5/14/14 at 6:07 pm to
BR has always struggled with making simple adjustments to ease traffic. I've always wondered what would be so hard about synchronizing green lights. Can't be that hard bc right now the reds are synced.
Posted by Roscoe
Member since Sep 2007
2918 posts
Posted on 1/6/15 at 1:19 pm to
I see they are starting to do road construction on the stretch of Lee between Burbank and Nicholson. Would have been nice if they could have started this project while school was out.

That aside, anyone know the continued hold up with the Nicholson/Brightside Green light? The time table on the Green Light Project continues to say they are in the "right of way" phase, which this project has been stuck on for years. If they haven't been able to work out the deal with the railroad after all this time, will a deal ever get worked out?
first pageprev pagePage 3 of 5Next pagelast page