Started By
Message

re: off/on ramp construction on I10 near Pecue

Posted on 1/4/24 at 7:32 pm to
Posted by cajungoalie
Baton Rouge
Member since Oct 2008
521 posts
Posted on 1/4/24 at 7:32 pm to
quote:

I know it's kind of a trope to say this but Texas would have built this interchange and widened all of Pecue in 12 months on the long end.


6 bridges, MSE walls, 4 ramps and widening from 2 lanes to 6 lane curb and gutter, and Connection to Reiger Road all in 12 months?

Ok sport.
Posted by The Boat
Member since Oct 2008
164532 posts
Posted on 1/4/24 at 7:39 pm to
quote:

6 bridges, MSE walls, 4 ramps and widening from 2 lanes to 6 lane curb and gutter, and Connection to Reiger Road all in 12 months?

Ok sport.

Yes.

Muh Louisiana soil
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram