Started By
Message

re: LSU College of Engineering Renderings (Updated)

Posted on 6/3/14 at 9:03 pm to
Posted by TigersOfGeauxld
Just across the water...
Member since Aug 2009
25057 posts
Posted on 6/3/14 at 9:03 pm to
quote:

Going to be a long, painful 4 years.


I have 2016 or 2017 as the completion date. What changed?
Posted by GeorgeReymond
Buckhead
Member since Jan 2013
10350 posts
Posted on 6/3/14 at 9:03 pm to
You are correct, my mistake

quote:

The modern renderings were scrapped. It's going to match the traditional feel of campus.


Posted by man in the stadium
Member since Aug 2006
1428 posts
Posted on 6/3/14 at 9:04 pm to
quote:

t's going to match the traditional feel of campus


is the business school considered to 'match the traditional feel of campus'?
Posted by jimbeam
University of LSU
Member since Oct 2011
75703 posts
Posted on 6/3/14 at 9:05 pm to
Hopefully not
Posted by Golfer
Member since Nov 2005
75052 posts
Posted on 6/3/14 at 9:08 pm to
quote:

is the business school considered to 'match the traditional feel of campus'?


No.
Posted by Grilled Bald Eagle
Baton Rouge
Member since Jun 2008
1069 posts
Posted on 6/3/14 at 9:08 pm to
quote:

I have 2016 or 2017 as the completion date. What changed?


The realities of essentially rebuilding an entire building while it remains in use. Theyve told us to expect 4 years
Posted by TheIndulger
Member since Sep 2011
19245 posts
Posted on 6/3/14 at 9:12 pm to
quote:

frick that Patrick F Taylor bullshite


Patrick F Taylor was a fricking god. He was a badass louisiana oilman, entrepreneur, and philanthropist. And people would rather cling to the lame arse name "CEBA"? I never understand the mindset of some of you dweebs.

This post was edited on 6/3/14 at 9:13 pm
Posted by GeorgeReymond
Buckhead
Member since Jan 2013
10350 posts
Posted on 6/3/14 at 9:15 pm to
I found this picture ~2011. It just took me a good 15 min to find it again. It's small but does anyone know if they plan to go forward with this building? I believe they were going to demo the forestry building and replace it with this Engineering Building. It's been awhile so I can't remember much details



eta: LINK
This post was edited on 6/3/14 at 9:16 pm
Posted by jimbeam
University of LSU
Member since Oct 2011
75703 posts
Posted on 6/3/14 at 9:15 pm to


Checked the link. That's the ChemE building. It's going right next to new CEBA. In faculty lot
This post was edited on 6/3/14 at 9:18 pm
Posted by Golfer
Member since Nov 2005
75052 posts
Posted on 6/3/14 at 9:16 pm to
Nope. Old forestry and the snack shop are being torn down and that will be green space. The food service will be moved into the building.
Posted by GeorgeReymond
Buckhead
Member since Jan 2013
10350 posts
Posted on 6/3/14 at 9:18 pm to
You the man
Posted by Franks
AMERICA'S CITY
Member since Apr 2014
50 posts
Posted on 6/3/14 at 9:29 pm to
Every time we do work on campus we get hammered on the 'Campus Standards'...Terracotta Tile / Yellow Conrete look.

That being said, on the outskirts of campus they tend to be able to get away from the core arch. standards of LSU
Posted by When in Rome
Telegraph Road
Member since Jan 2011
35983 posts
Posted on 6/3/14 at 9:50 pm to
They opened the new business building the semester after I switched from finance to engineering. Then I'll graduate and the new engineering building will open.

I'm doomed to be stuck in CEBA
Posted by goldenbadger08
Sorting Out MSB BS Since 2011
Member since Oct 2011
37905 posts
Posted on 6/3/14 at 9:54 pm to
No one cares.
Posted by jimbeam
University of LSU
Member since Oct 2011
75703 posts
Posted on 6/3/14 at 9:55 pm to
I know right. There'll be renovations the rest of the time I'm here
Posted by When in Rome
Telegraph Road
Member since Jan 2011
35983 posts
Posted on 6/3/14 at 9:55 pm to
Why do you have to make a rude comment in response to most of my posts? You're like a yappy dog that won't shut up.
Posted by goldenbadger08
Sorting Out MSB BS Since 2011
Member since Oct 2011
37905 posts
Posted on 6/3/14 at 9:56 pm to
Woof.
Posted by TigersOfGeauxld
Just across the water...
Member since Aug 2009
25057 posts
Posted on 6/4/14 at 6:44 am to
quote:

They opened the new business building the semester after I switched from finance to engineering. Then I'll graduate and the new engineering building will open.

I'm doomed to be stuck in CEBA


The good news is, you will come back to the campus one day and get a great deal of pleasure at how much better it is than you remember.

Take it from me. It's an awesome feeling.

Posted by ksayetiger
Centenary Gents
Member since Jul 2007
69748 posts
Posted on 6/4/14 at 6:50 am to
quote:

Going to be a long, painful 4 years.



I have 2016 or 2017 as the completion date. What changed?


construction at lsu is like my degree at lsu. its nice when finished but it will take much longer than expected
Posted by When in Rome
Telegraph Road
Member since Jan 2011
35983 posts
Posted on 6/4/14 at 7:01 am to
Good point.
first pageprev pagePage 2 of 5Next pagelast page

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram