LADOTD excellence: Nicholson Drive has been stripped of its pavement for almost a year

Posted on 12/15/23 at 7:47 am
Posted by goofball
Member since Mar 2015
16859 posts
Posted on 12/15/23 at 7:47 am
LINK
quote:



BATON ROUGE - For nearly a year, Nicholson Drive has been stripped of its top layer, making a rough ride for drivers.

An overlay of LA 30 between LSU and downtown Baton Rouge is only one aspect of a much larger project that involves re-aligning the I-10 off-ramp to meet with Oklahoma Street. Sidewalks will also eventually line that stretch of Nicholson.



quote:

The entire project including the new I-10 off ramp to Oklahoma Street will be finished by next football season, weather permitting. A new traffic signal will be installed at LA 30 and Oklahoma Street before the end of the year.


Yeah that ramp will probably take an extra year too.
Posted by winkchance
St. George, LA
Member since Jul 2016
4106 posts
Posted on 12/15/23 at 8:01 am to
I think there is a bunch of drainage work being done along here too. There does not seem to aba fast way to do that and let cars run through the project. A buddy I know who works road construction said they could do jobs in 1/4 of the time if they could shut roads down.
Posted by whoa
New Orleans
Member since Sep 2017
4596 posts
Posted on 12/15/23 at 8:06 am to
Anyone have the plans for what they’re doing at the exit ramp & Terrace?

It looks like they’re extending the exit ramp to Oklahoma Street? If that’s the case, thank God cause nobody coming off the bridge knows what the frick “Yield” means.
Posted by CocomoLSU
Inside your dome.
Member since Feb 2004
150710 posts
Posted on 12/15/23 at 8:25 am to
quote:

icholson Drive has been stripped of its pavement for almost a year

It's bullshite and pisses me off every single day.

I remember going to work one day and seeing one side stripped and thinking how awesome it was that they were finally gonna repave Nicholson because it fricking sucks. And now a year later it's still there, on both sides. It's stupid. Don't strip it until you're ready to pave it. Seems like common sense to me, but I guess DOTD disagrees.
Posted by Bulldozer1899
Member since Aug 2017
141 posts
Posted on 12/15/23 at 8:32 am to
It’s a LADOTD issue. The engineers who gave the most $$$ did a $hit job doing thier design. All they did was google earth and draw some line on plans. Once it was milled they realized it needs drainage.


So then went back to engineers (who will charge more) to design drainage.

So the public only sees the contractor out there doing nothing and blame them.

Posted by doubleb
Baton Rouge
Member since Aug 2006
36021 posts
Posted on 12/15/23 at 8:55 am to
The money people behind the Water Campus wanted a better entrance from the interstate. The Terrace exit is being moved South a block to line up with the main entrance to the Water Campus.

The reworking of Nicholson was made a part of this project. I guess the money people wanted it upgraded too.

The news reported that when work began they discovered many drainage issues so they are correcting those as part of the upgrade.

We are seeing Louisiana at its finest. The project is meant to help the “right” people and it’s creeping alone in true La. fashion.
Posted by tadman
Member since Jun 2020
3815 posts
Posted on 12/15/23 at 9:04 am to
This must be some well-connected contractor or paving company in Louisiana. They did the same in New Orleans uptown a few years ago. Uptown is riddled with pot holes. The low bidder presented a model where they would auger out a sqaure around each pot hole in uptown, then come through all at once and pave all of them.

It took over a year to come back through and pave. Meanwhile every genius voter in NOLA had a 5x7' square hole in front of their house filling with water and breeding mosquitos. There was no parking. It was hard to get large goods delivered to the house. It was an utter disaster and our councilman lost his election over it.

Of course Latrasha made a bunch of noise about it and guaranteed us the holes would be filled by Christmas 2021, which did not happen.
Posted by goofball
Member since Mar 2015
16859 posts
Posted on 12/15/23 at 9:05 am to
quote:

The money people behind the Water Campus wanted a better entrance from the interstate. The Terrace exit is being moved South a block to line up with the main entrance to the Water Campus.


When is Engquist moving H&E’s headquarters there? He’s team downtown right? Or is he going to keep it way out in St George?

Couple of nice looking buildings there but they are mostly leased out.
This post was edited on 12/15/23 at 9:06 am
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram