Page 1
Page 1
Started By
Message

What % of the cost of a new build is finish work?

Posted on 2/12/24 at 9:28 am
Posted by Salmon
I helped draft the email
Member since Feb 2008
85136 posts
Posted on 2/12/24 at 9:28 am
If you were building a new home, but you only needed the contractor to get you to finish work, like plumbing and electrical stubbed and the sheetrock floated, what % cost of the total build would that be?

Basically how much money would I save for doing all the finish work (paint, molding, flooring, cabinetry) myself?
Posted by poochie
Houma, la
Member since Apr 2007
6765 posts
Posted on 2/12/24 at 11:48 am to
From my experience, labor for each of those is about $10k-$15k each.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram