- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
Curbing?
Posted on 8/6/26 at 9:37 am
Posted on 8/6/26 at 9:37 am
Our neighborhoods curb is deteriorating and our HOA is looking to get prices on a full remove and replace for about 1,500 feet.
Any recommendations in the Baton Rouge area that can handle this?

Any recommendations in the Baton Rouge area that can handle this?

This post was edited on 8/6/26 at 9:38 am
Posted on 8/6/26 at 9:53 am to Roy Curado
that rollover curb was just poured right on top of the concrete road surface. No wonder it broke into pieces
Tell your HOA that if they do it that way again they’ll be replacing it again
Tell your HOA that if they do it that way again they’ll be replacing it again
Posted on 8/6/26 at 10:59 am to cgrand
The builder of the neighborhood is to blame and he is no longer alive.
Posted on 8/6/26 at 1:43 pm to Roy Curado
You can try 311 and put in a request.
This is assuming the curb was laid down as part of the street initially.
But even if not, don’t ask, don’t get.
This is assuming the curb was laid down as part of the street initially.
But even if not, don’t ask, don’t get.
This post was edited on 8/6/26 at 1:44 pm
Posted on 8/6/26 at 3:31 pm to Roy Curado
quote:scrape up the broken curb. then you have two options...
What is the solution to this?
1) put it back the way it was but leave a higher nose on the end (dont slope down to zero) and set some pins in the road surface to keep the curb from moving laterally
2) sawcut and excavate a narrow continuous footing at the end of the slope, then pin and pour...make it have a small turndown below grade at the skinny end
#2 would be a gigantic PIA
Posted on 8/6/26 at 5:11 pm to cgrand
That’s a normal way to pour rollover curb.
The problem is people don’t put expansion joint between the curb and driveway when they build and it pushes the back of curb and it breaks.
The problem is people don’t put expansion joint between the curb and driveway when they build and it pushes the back of curb and it breaks.
Posted on 8/6/26 at 5:12 pm to Roy Curado
quote:
The builder of the neighborhood is to blame and he is no longer alive.
look at how old that driveway and curb is. That ain’t no warranty job, lol.
Popular
Back to top
2





