- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: Bulkhead Pricing in Baton Rouge
Posted on 6/4/21 at 10:55 am to Crusty
Posted on 6/4/21 at 10:55 am to Crusty
That is awfully high. I had 60’ done about 10 years ago and it ran about ***EDIT $230 not $130***per foot (I know material costs have gone up but not that much).
I had a water depth of 4’ and the top of the bulkhead is 3’ above that. I think the sheets were 12’ total length (maybe longer).
The price included driving pilings, a concrete trench with rods connected thru the sheets and into the pilings. Also had about 2’ of back fill with an average depth of 6-7’.
The guy that did mine passed away a few years back. RIP Rick Barrios.
I had a water depth of 4’ and the top of the bulkhead is 3’ above that. I think the sheets were 12’ total length (maybe longer).
The price included driving pilings, a concrete trench with rods connected thru the sheets and into the pilings. Also had about 2’ of back fill with an average depth of 6-7’.
The guy that did mine passed away a few years back. RIP Rick Barrios.
This post was edited on 6/4/21 at 11:07 am
Posted on 6/4/21 at 10:58 am to captainahab
I thought the price I was told was really high, but I didn't think it would be as low as $130/foot! I never met Rick, but RIP Mr. Barrios.
Popular
Back to top
Follow TigerDroppings for LSU Football News