Started By
Message

re: Bulkhead Pricing in Baton Rouge

Posted on 6/4/21 at 10:55 am to
Posted by captainahab
Highway Trio8
Member since Dec 2014
1607 posts
Posted on 6/4/21 at 10:55 am to
That is awfully high. I had 60’ done about 10 years ago and it ran about ***EDIT $230 not $130***per foot (I know material costs have gone up but not that much).

I had a water depth of 4’ and the top of the bulkhead is 3’ above that. I think the sheets were 12’ total length (maybe longer).

The price included driving pilings, a concrete trench with rods connected thru the sheets and into the pilings. Also had about 2’ of back fill with an average depth of 6-7’.

The guy that did mine passed away a few years back. RIP Rick Barrios.
This post was edited on 6/4/21 at 11:07 am
Posted by Crusty
Baton Rouge
Member since Aug 2011
2447 posts
Posted on 6/4/21 at 10:58 am to
I thought the price I was told was really high, but I didn't think it would be as low as $130/foot! I never met Rick, but RIP Mr. Barrios.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram