Started By
Message

re: Over 1,000 jobs cut by company building Keystone XL pipeline after Biden ends project

Posted on 1/22/21 at 12:26 pm to
Posted by bbap
Baton Rouge, LA
Member since Feb 2006
96074 posts
Posted on 1/22/21 at 12:26 pm to
quote:

I learned the other day that those blades on the wind turbines only last 2 years and no landfills will take them so there are piles of massive blades just stacked up that they can't do anything with



If landfills wont take them, where are they stacked up? Just curious.
Posted by 777Tiger
Member since Mar 2011
73856 posts
Posted on 1/22/21 at 12:27 pm to
quote:

where are they stacked up? Just curious.



the everblades I think
Posted by fr33manator
Baton Rouge
Member since Oct 2010
124973 posts
Posted on 1/22/21 at 12:27 pm to
quote:

If landfills wont take them, where are they stacked up? Just curious.


They’ll be used to build “re-education camps” for wrongthinkers
Posted by upgrayedd
Lifting at Tobin's house
Member since Mar 2013
135222 posts
Posted on 1/22/21 at 12:28 pm to
quote:

If landfills wont take them, where are they stacked up? Just curious.

I assume either in a designated location or on the wind farm properties.
Posted by bad93ex
Walnut Cove
Member since Sep 2018
27667 posts
Posted on 1/22/21 at 2:12 pm to
quote:

If landfills wont take them, where are they stacked up? Just curious.



Casper, WY

first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram