Started By
Message

re: Diving deeper on Standard Lithium?

Posted on 8/25/21 at 8:58 am to
Posted by igoringa
South Mississippi
Member since Jun 2007
11877 posts
Posted on 8/25/21 at 8:58 am to
I think psychologically it would be easier if we didn’t know news is out there. Tetra PEA in ‘early q3’. Obviously JV. More info on sifter and South American inflow of below battery grade.

Knowing stuff is pending makes it harder
Posted by el Gaucho
He/They
Member since Dec 2010
53479 posts
Posted on 8/25/21 at 9:00 am to
I just wish that the people at sli would realize that a lot of us depend on sli to make a living and make the stock go up
Posted by GeneralLee
Member since Aug 2004
13112 posts
Posted on 8/25/21 at 9:03 am to
Yeah I'm not expecting JV news for another month or so, but on the flip side I think the lag we expected between the JV announcement and FID being reached on the 1st plant (which I had originally thought would be 3-4 months), will probably be much shorter than that. So they still may get to the same starting point of starting Plant 1 construction at the start of 2022.

I fully expect the shorts and the MM's to make it a painful game for us to wait on the news, but as they say it's darkest before the dawn.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram