- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: OB Engineers: Steel Beams to Make a Bridge
Posted on 2/10/20 at 9:01 pm to No Colors
Posted on 2/10/20 at 9:01 pm to No Colors
any stone around there?
dad has a bad wet crossing in Arkansas we wound up blasting some limestone and basically rip rapping the crossing, after a couple of floods the gravel kinda paved it over
every year or so we take a tractor bucket or two and dump it on top.
consider a wooden structure. three or four felled trees could provide your span, stronger than steel
dad has a bad wet crossing in Arkansas we wound up blasting some limestone and basically rip rapping the crossing, after a couple of floods the gravel kinda paved it over
every year or so we take a tractor bucket or two and dump it on top.
consider a wooden structure. three or four felled trees could provide your span, stronger than steel
Posted on 2/10/20 at 9:09 pm to cgrand
No stone around. We would have to haul rip rap from the barge port at Vicksburg. Also, the creek is subject to the MS River. We can't cross it when the river is at 42 feet or higher on the Vicksburg gage. Which, in the past was like maybe a few weeks a year. Some times we would go several years in a row without seeing a river that high. But recently it has been something like 22 of the last 36 months. Plus, when the water sits on it for that long, it drops crazy amounts of silt that must be dealt with. It has basically been unusable for most of the past three years.
I'm tired of fixing it. Tired of being subject to it. I'm ready to write one check and be done with it for good. Let it be my son's problem to fool with when he's my age.
I'm tired of fixing it. Tired of being subject to it. I'm ready to write one check and be done with it for good. Let it be my son's problem to fool with when he's my age.
Back to top
Follow TigerDroppings for LSU Football News