Started By
Message

re: New Ascension Parish Building Requirements

Posted on 5/17/19 at 2:45 pm to
Posted by lsu13lsu
Member since Jan 2008
11488 posts
Posted on 5/17/19 at 2:45 pm to
Retention ponds are usually dug first to make use of dirt. By the time development is complete those things have eroded and silted in and are not worth a damn.

The entire retention pond scheme is a joke.
This post was edited on 5/17/19 at 2:52 pm
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram