Started By
Message

re: Austin Chalk Updates?

Posted on 6/12/19 at 7:41 am to
Posted by hubertcumberdale
Member since Nov 2009
6538 posts
Posted on 6/12/19 at 7:41 am to
quote:

The first month released on sonris for the mckowen well is really poor, practically a producing dry hole.


The only production month on SONRIS is March 2019 (1,006 bbls) and that is a partial production month, prob only for a few days, as they flowed the well back from the frac in the middle of March 2019.

April 2019 will be very telling, assuming they produced it for a full month and didnt mess with the choke. I assume they need to do >20,000 bbl/month initially for it be economical, considering it performs similar to the Texas Austin Chalk, which is way more than 1,006 in March.

McKowen #1
This post was edited on 6/12/19 at 7:52 am
Posted by TigerDog83
Member since Oct 2005
8275 posts
Posted on 6/12/19 at 8:56 am to
Completion was filed for March 8, so assuming that’s for most of March that’s an alarmingly low number for oil and especially for gas cleaning up after a frac. We will see but I’d be leaning towards this well isn’t very good.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram