- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: Planned I-10 widening will involve replacing elevated highway through Baton Rouge
Posted on 9/18/18 at 4:58 pm to TigerstuckinMS
Posted on 9/18/18 at 4:58 pm to TigerstuckinMS
It’ll probably be Boh or James, they should just form a joint venture for this project, no need to bid it out they have wheels greased.
Posted on 9/18/18 at 5:12 pm to baseballmind1212
quote:
It's ok guys. I hear Boh Bros. Will be doing the work.
Boh Bros will sub the bridge/elevated work which they are very good at. James can handle it and remember Austin Road and Bridge came in here, fricked up I-10 and was booted out. Not all out of town road builders are the same.
Posted on 9/18/18 at 7:45 pm to Scoop
quote:
It will take years, cost a king’s ransom and when it is all said and done, the traffic will be just as bad due to induced demand.
When more lanes are added, it brings more traffic from people that sought alternate, less convenient routes beforehand until the previous level of congestion is met again.
Basically, the new capacity will be filled by a new influx of traffic and congestion will not improve
Posted on 9/18/18 at 8:09 pm to AA77
Screw adding one lane. Add 2-3 in each direction.
Fix it for future traffic, not the 1990’s traffic.
Fix it for future traffic, not the 1990’s traffic.
Posted on 9/18/18 at 8:11 pm to AA77
quote:They can fix the downtown library at the same time.
Who has the job to clean them up...?
Posted on 9/18/18 at 8:11 pm to Bullfrog
quote:
Screw adding one lane. Add 2-3 in each direction
I had the same complaint about I-12. They tore it up for years to add one lane. It made some difference but they should have just four laned it in both directions to at least Walker.
Posted on 9/18/18 at 8:12 pm to AA77
Spend that money in St. Tammany. Frick BR.
Posted on 9/18/18 at 8:14 pm to fallguy_1978
I'd like to see a big vertical loop.
Just pass over the entire city.
Just pass over the entire city.
Posted on 9/18/18 at 8:14 pm to Bullfrog
quote:
crew adding one lane. Add 2-3 in each direction. Fix it for future traffic, not the 1990’s traffic.
Only one real fix other than a bypass loop, double deck it, lower deck for local traffic with on and off ramps, upper deck for through traffic no, or few on and off ramps, eventually extend it out to Denham S.
Posted on 9/18/18 at 8:16 pm to Tigerbait357
quote:
I'll believe it when I see it
They actually seem to be pushing this through the process pretty quickly since about February.
I think we start seeing prelim construction in a year or less. Major work in less than 2.
Posted on 9/18/18 at 8:17 pm to EA6B
This situation is made to order for a double decker solution.
No California earthquakes to worry about a collapse.
No California earthquakes to worry about a collapse.
Posted on 9/18/18 at 8:19 pm to Bullfrog
quote:
Screw adding one lane. Add 2-3 in each direction.
They are making the new spans wide enough for 13 foot wide shoulders inside and out.
So they can add two more lanes (10 total) by just re-striping and still keep overpass clearances and the outside shoulder.
It’s actually a pretty well thought out project by any standard. Extremely unusual for Louisiana.
This post was edited on 9/18/18 at 8:20 pm
Posted on 9/18/18 at 8:21 pm to member12
quote:
They are making the new spans wide enough for 13 foot wide shoulders inside and out.
I always assumed that's why the I-12 shoulders were made so wide. Those inside shoulders are easily wide enough for an additional lane.
Posted on 9/18/18 at 8:33 pm to LSUFanHouston
quote:
Maybe they can talk to TXDOT to get some help
Isn't TXDOT in charge of the never ending construction on I-10 just past the LA border?
Posted on 9/18/18 at 8:35 pm to Scoop
quote:
Basically, the new capacity will be filled by a new influx of traffic and congestion will not improve
This happened on I-12.
Posted on 9/18/18 at 8:50 pm to EST
quote:
This happened on I-12.
They screwed up by not widening it past the river 25 years ago. It’s much better now.
Posted on 9/18/18 at 8:57 pm to AA77
Frankly, I think that big arse crane is gonna just sit there through the next governor's election. After that, the crane will be moved out and a return to bidness as usual. More talk and nothing done.
Posted on 9/18/18 at 9:01 pm to EST
quote:The route from the LA border to Houston has been partially under construction my entire life. I've never made that drive without having to go through a construction zone somewhere.
Isn't TXDOT in charge of the never ending construction on I-10 just past the LA border?
Now, that's not all bad because it means they're working and improving things. But, still, that's not necessarily evidence of a place that has road construction figured out.
Posted on 9/18/18 at 9:02 pm to AA77
quote:
The work will be done in phases that are projected to take between five and seven years
I can't live through 5-7 years of road construction in BR.