Started By
Message

re: off/on ramp construction on I10 near Pecue

Posted on 1/4/24 at 6:29 pm to
Posted by The Boat
Member since Oct 2008
164528 posts
Posted on 1/4/24 at 6:29 pm to
I know it's kind of a trope to say this but Texas would have built this interchange and widened all of Pecue in 12 months on the long end.
Posted by cajungoalie
Baton Rouge
Member since Oct 2008
521 posts
Posted on 1/4/24 at 7:32 pm to
quote:

I know it's kind of a trope to say this but Texas would have built this interchange and widened all of Pecue in 12 months on the long end.


6 bridges, MSE walls, 4 ramps and widening from 2 lanes to 6 lane curb and gutter, and Connection to Reiger Road all in 12 months?

Ok sport.
Posted by NickyT
Patty's Pub
Member since Jan 2007
8613 posts
Posted on 1/4/24 at 9:27 pm to
How is that stretch of 10 going in east Texas? 50 year build?
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram