Started By
Message

re: Coastal Master Plan - is it working? Humans vs Mother Nature

Posted on 5/27/23 at 10:44 am to
Posted by GREENHEAD22
Member since Nov 2009
19626 posts
Posted on 5/27/23 at 10:44 am to
It would be interesting to see how sediment would disperse if the river switch to the Atch. I bet Terrebonne would still get screwed.
This post was edited on 5/27/23 at 10:57 am
Posted by cgrand
HAMMOND
Member since Oct 2009
38926 posts
Posted on 5/27/23 at 10:50 am to
I think they have it metered pretty well right there between the wax/river/MS river. They need to blow the levees south of belle chase and they need to do it now

You’d have engineered a high powered land building machine if you did that. Probably work faster that way too
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram