Started By
Message

re: Buc-ee’s timeline altered due to DOTD studies

Posted on 3/16/23 at 7:41 am to
Posted by GetCocky11
Calgary, AB
Member since Oct 2012
51518 posts
Posted on 3/16/23 at 7:41 am to
quote:

“The DOTD requires a traffic study that will take 180 days,” said Walker. “At the same time there has to be an interchange and modification report that will take 12 months.


For a gas station?
Posted by achenator
Member since Oct 2014
2968 posts
Posted on 3/16/23 at 7:49 am to
To be fair. The one at Menge on i10 in Miss. was announced like 2 years ago and I don’t see anything going on over there.
Posted by Jester
Baton Rouge
Member since Feb 2006
34516 posts
Posted on 3/16/23 at 8:24 am to
quote:

For a gas station?


Have you seen the number of vehicles going in and out of a Bucees? You don't think it warrants studying the impact to surrounding roads?

People acting like Bucees is some bizarre white trash Mecca bazaar.
This post was edited on 3/16/23 at 8:25 am
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram