re: I10 @ Pecue Lane- Baton Rouge

Posted on 2/4/22 at 8:40 am to
Posted by PhiTiger1764
Lurker since Aug 2003
Member since Oct 2009
13936 posts
Posted on 2/4/22 at 8:40 am to
quote:

Pathetic…but very typical of LA. Any other state would have had this completed in 2 years.

Literally from your own link that you posted, they say they don’t want to build Interstate ramp access until Pecue is 4 lanes from Airline to Perkins. So that has to be constructed first. It is planned out this way.

I swear some of y’all just love to complain.
Posted by sec13rowBBseat28
St George, LA
Member since Aug 2006
15401 posts
Posted on 2/4/22 at 8:50 am to
quote:

It is planned out this way.


Exactly…A project like this is planned out to take 10 freaking years. As I said, other states like TX would have this completed in 2 years.
Posted by dewster
Chicago
Member since Aug 2006
25412 posts
Posted on 2/4/22 at 8:51 am to
quote:

Literally from your own link that you posted, they say they don’t want to build Interstate ramp access until Pecue is 4 lanes from Airline to Perkins


There will be a frenzy of retail development along Perkins in front of Woodridge once that exit ramp completes. Hopefully a little better thought out than what was built on Siegen.
Posted by doubleb
Baton Rouge
Member since Aug 2006
36255 posts
Posted on 2/4/22 at 9:07 am to
quote:


Literally from your own link that you posted, they say they don’t want to build Interstate ramp access until Pecue is 4 lanes from Airline to Perkins. So that has to be constructed first. It is planned out this way.

I swear some of y’all just love to complain.


Bait and switch going on here.

Broome had them clear the woods for the on/off ramps 4 plus years ago as if work was ready to begin on the interchange. Instead all they did was build a new overpass two years later.

FWIW, EBR taxpayers voted to fund this project in 2005 in Kip’s Greenlight plan. In Broome’s MovEBR plan more money was committed to this project.

It’s been 17 years and now we hear it might be 10 more years. Lol
This post was edited on 2/4/22 at 9:08 am
Posted by beerandt
Member since Jan 2020
293 posts
Posted on 2/4/22 at 9:56 am to
quote:

It is planned out this way.


That's a BS excuse: they had already taken so long that the studies and funding were about to expire. So clearing trees was used to claim "start of construction".

They needed an excuse to save face on the delays, and not make it completely obvious that they needed to start work, but weren't ready to.
Posted by 4WHLN
Drinking at the Cottage Inn
Member since Mar 2013
7582 posts
Posted on 2/4/22 at 10:29 am to
quote:

they say they don’t want to build Interstate ramp access until Pecue is 4 lanes from Airline to Perkins. So that has to be constructed first.

Why?
quote:

It is planned out this way.

Why?

Only in Louisiana could the "parties at be", ROYALLY frick this up.
Why could we not do the Overpass as Pecue is being widened at the same time?

Everything this state does is assbackwards
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram