Started By
Message

re: “We Build the Wall” Completes First Half Mile Border Wall in 4 Days from Private Donations

Posted on 5/28/19 at 1:02 pm to
Posted by TBoy
Kalamazoo
Member since Dec 2007
26160 posts
Posted on 5/28/19 at 1:02 pm to
quote:

Kris told us, “The Army Corp of Engineers said it was impossible to build the wall here. They looked at the incline that climbs 300 ft over the course of this half mile and they said it cant be built. We proved them wrong.


There is no visible incline in any of the pictures or in the video. Are we supposed to believe that the Army Corps of Engineers actually said it was impossible to construct a fence or wall on that land?
Posted by Vacherie Saint
Member since Aug 2015
43861 posts
Posted on 5/28/19 at 1:07 pm to
Naw bro. It’s a battery powered angle grinder... to saw through 8 inch steel bollards filled with concrete and rebar in less than 30 minutes. Libs have this figured out.

Ask Proggy Hank if he knows what happens when a grinder wheel or a rosebud from a torch hit that concrete. They are the experts!
Posted by WeeWee
Member since Aug 2012
42857 posts
Posted on 5/28/19 at 1:11 pm to
quote:

I'm not sure. Watch the Rogan podcast with Ed Calderon I believe. He said the cartels have tunnels running under the wall all along the border. The mules run drugs in and out of those things. I know that they have found several tunnels in the San Diego area going from Mexico to California.


Step 1: Legalize drugs

Step 2: Tear down the border fence between Mexico and California.

Step 3: Relocate that border fence to the border between
La República Popular Democrática de California y los Estados Unidos de América.
first pageprev pagePage 5 of 5Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram