Started By
Message

re: New Bridge coming into BR is down to one lane - Construction

Posted on 6/2/18 at 8:48 pm to
Posted by OysterPoBoy
City of St. George
Member since Jul 2013
45546 posts
Posted on 6/2/18 at 8:48 pm to
quote:

Take the Ferry. It’s probably a bit out the way for most but it’s better than sitting in BR teaffic.



One of life’s greatest pleasures is getting out and smoking a cig with one of the ferry baws.
Posted by RougeDawg
Member since Jul 2016
7751 posts
Posted on 6/2/18 at 9:06 pm to
Takes longer than one night to to place that many lifts of asphalt and let it cure.
Posted by OKTGR580
Baton Rouge to Houston, TX
Member since Apr 2018
6318 posts
Posted on 6/3/18 at 11:03 am to
What exactly does “repair the failing approach from the west side of the river” mean??
Posted by JPinLondon
not in London (currently NW Ohio)
Member since Nov 2006
7881 posts
Posted on 6/3/18 at 11:04 am to
quote:

What exactly does “repair the failing approach from the west side of the river” mean??

You gon' die.
first pageprev pagePage 2 of 2Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram