- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message

Is construction on Slidell section of 10 done?
Posted on 7/31/15 at 11:35 am
Posted on 7/31/15 at 11:35 am
Going to be rolling west thru there in about 3 hours.
Showing clear now on Google maps.
Showing clear now on Google maps.
Posted on 7/31/15 at 11:37 am to Jimbeaux28
They don't start until 8 or 9pm on Friday and finish up at 3 4 or 5am Monday IIRC.
Posted on 7/31/15 at 11:45 am to Jimbeaux28
LINK
I-10/I-12/I-59 (French Branch Bridge - West Pearl River Bridge) St. Tammany Parish
Thursday, July 30, 2015
SPN H.003107: I-10/I-12/I-59 (FRENCH BRANCH BRIDGE – WEST PEARL RIVER BRIDGE)
ST. TAMMANY PARISH
I-10/I-12/I-59 Ramp and Lane Closures
July 30, 2015
WEEKDAY CLOSURES
There will be daily alternating closures of the inside (left) and outside (right) lanes on the I-10/I-12/I-59 interstates on Sunday, August 2, 2015 through Thursday, August 6, 2015 (weather permitting) while crews remove and replace the roadway at the following locations:
• I-10 Eastbound between the French Branch Bridge (Mile Post 267.14) (just north of Gause Blvd.) and the West Pearl River Bridge (Mile Post 269.81) (near the I-10 Welcome Center) from 5:00 p.m. to 10:00 a.m. Monday through Thursday. All lanes will be open between 10:00 a.m. and 5:00 p.m. daily.
• I-10 Westbound between the West Pearl River Bridge (Mile Post 269.81) (near the I-10 Welcome Center) and the French Branch Bridge (Mile Post 267.14) (just north of Gause Blvd.) from 6:00 p.m. to 2:00 p.m. Monday through Thursday. All lanes will be open between 2:00 p.m. and 6:00 p.m. daily.
• I-59 Southbound between the I-59 Rest Area (Mile Post 1) and the I-10/I-59 split (Mile Post 0) from 9:00 a.m. to 5:00 a.m. Sunday through Thursday. All lanes will be open from 5:00 a.m. to 9:00 a.m. daily.
• I-59 Northbound between the I-10/I-59 split (Mile Post 0) and I-59 Rest Area (Mile Post 1) from 7:00 p.m. to 12:00 noon Sunday through Thursday. All lanes will be open from 12:00 noon to 7:00 p.m. daily.
• I-12 Eastbound between the I-59 underpass (Mile Post 85.54) and I-10 merge (Mile Post 86.28) from 4:00 p.m. to 2:00 p.m. Sunday through Thursday. All lanes will be open between 2:00 p.m. and 4:00 p.m. daily.
• I-12 Eastbound Exit Ramp to I-10 Westbound (Exit 85A) shoulder closure from 4:00 p.m. to 2:00 p.m. Sunday through Thursday. The Exit Ramp lane will remain open at all times.
Permit/ Detour Section
One lane of traffic will remain open at all times. No oversized loads greater than 12’ wide will be allowed through the construction zone during lane closures.
Motorists wanting to utilize US 90 as a detour should be aware that there are load restrictions on the Pearl River Bridges which only allow for passenger vehicles. No larger truck traffic will be allowed.
DETOUR MAP (REVISED): LINK
DETOUR FLYER (REVISED): LINK
I-10/I-12/I-59 (French Branch Bridge - West Pearl River Bridge) St. Tammany Parish
Thursday, July 30, 2015
SPN H.003107: I-10/I-12/I-59 (FRENCH BRANCH BRIDGE – WEST PEARL RIVER BRIDGE)
ST. TAMMANY PARISH
I-10/I-12/I-59 Ramp and Lane Closures
July 30, 2015
WEEKDAY CLOSURES
There will be daily alternating closures of the inside (left) and outside (right) lanes on the I-10/I-12/I-59 interstates on Sunday, August 2, 2015 through Thursday, August 6, 2015 (weather permitting) while crews remove and replace the roadway at the following locations:
• I-10 Eastbound between the French Branch Bridge (Mile Post 267.14) (just north of Gause Blvd.) and the West Pearl River Bridge (Mile Post 269.81) (near the I-10 Welcome Center) from 5:00 p.m. to 10:00 a.m. Monday through Thursday. All lanes will be open between 10:00 a.m. and 5:00 p.m. daily.
• I-10 Westbound between the West Pearl River Bridge (Mile Post 269.81) (near the I-10 Welcome Center) and the French Branch Bridge (Mile Post 267.14) (just north of Gause Blvd.) from 6:00 p.m. to 2:00 p.m. Monday through Thursday. All lanes will be open between 2:00 p.m. and 6:00 p.m. daily.
• I-59 Southbound between the I-59 Rest Area (Mile Post 1) and the I-10/I-59 split (Mile Post 0) from 9:00 a.m. to 5:00 a.m. Sunday through Thursday. All lanes will be open from 5:00 a.m. to 9:00 a.m. daily.
• I-59 Northbound between the I-10/I-59 split (Mile Post 0) and I-59 Rest Area (Mile Post 1) from 7:00 p.m. to 12:00 noon Sunday through Thursday. All lanes will be open from 12:00 noon to 7:00 p.m. daily.
• I-12 Eastbound between the I-59 underpass (Mile Post 85.54) and I-10 merge (Mile Post 86.28) from 4:00 p.m. to 2:00 p.m. Sunday through Thursday. All lanes will be open between 2:00 p.m. and 4:00 p.m. daily.
• I-12 Eastbound Exit Ramp to I-10 Westbound (Exit 85A) shoulder closure from 4:00 p.m. to 2:00 p.m. Sunday through Thursday. The Exit Ramp lane will remain open at all times.
Permit/ Detour Section
One lane of traffic will remain open at all times. No oversized loads greater than 12’ wide will be allowed through the construction zone during lane closures.
Motorists wanting to utilize US 90 as a detour should be aware that there are load restrictions on the Pearl River Bridges which only allow for passenger vehicles. No larger truck traffic will be allowed.
DETOUR MAP (REVISED): LINK
DETOUR FLYER (REVISED): LINK
Posted on 7/31/15 at 11:46 am to Boudreaux35
SPN H.003107: I-10/I-12/I-59 (FRENCH BRANCH BRIDGE – WEST PEARL RIVER BRIDGE)
St. Tammany Parish
July 27, 2015
WEEKEND WORK
**UPDATE**
There will be closures of the inside (left) and outside (right) lanes of I-10/I-59 on Friday, July 31, 2015 through Monday, August 3, 2015 (weather permitting) while crews remove and replace the roadway at the following locations:
• I-10 Eastbound inside (Left) lane between the French Branch Bridge (Mile Post 267.14) (just north of the Gause Blvd. Overpass) and the West Pearl River Bridge (Mile Post 269.81) (near the I-10 Welcome Center) from 6:00 p.m. Friday, July 31, 2015 to 10:00 a.m. Monday, August 3, 2015. All lanes will be re-open Monday, August 3, 2015 at 10:00 a.m.
• I-10 Westbound inside (left) lane between the West Pearl River Bridge (Mile Post 269.81) (near the I-10 Welcome Center) and the French Branch Bridge (Mile Post 267.14) (just north of the Gause Blvd. Overpass) from 6:00 p.m. Friday, July 31, 2015 to 2:00 p.m. Monday, August 3, 2015. All lanes will be re-open Monday, August 3, 2015 at 2:00 p.m.
I-59 Southbound inside (Left) lane between the I-10/I-59 split (Mile Post 0) and just south of the I-59 Rest Area (Mile Post 1) from 7:00 p.m. Friday, July 31, 2015 to 5:00 a.m. Monday, August 3, 2015. All lanes will re-open Monday, August 3, 2015 at 5:00 a.m.
Permit/ Detour Section
One lane of traffic will remain open at all times. No oversized loads greater than 12’ wide will be allowed through the construction zone during lane closures.
Motorists wanting to utilize US 90 as a detour should be aware that there are load restrictions on the Pearl River Bridges which only allow for passenger vehicles. No larger truck traffic will be allowed.
DETOUR MAP (REVISED): LINK
DETOUR FLYER (REVISED): LINK
St. Tammany Parish
July 27, 2015
WEEKEND WORK
**UPDATE**
There will be closures of the inside (left) and outside (right) lanes of I-10/I-59 on Friday, July 31, 2015 through Monday, August 3, 2015 (weather permitting) while crews remove and replace the roadway at the following locations:
• I-10 Eastbound inside (Left) lane between the French Branch Bridge (Mile Post 267.14) (just north of the Gause Blvd. Overpass) and the West Pearl River Bridge (Mile Post 269.81) (near the I-10 Welcome Center) from 6:00 p.m. Friday, July 31, 2015 to 10:00 a.m. Monday, August 3, 2015. All lanes will be re-open Monday, August 3, 2015 at 10:00 a.m.
• I-10 Westbound inside (left) lane between the West Pearl River Bridge (Mile Post 269.81) (near the I-10 Welcome Center) and the French Branch Bridge (Mile Post 267.14) (just north of the Gause Blvd. Overpass) from 6:00 p.m. Friday, July 31, 2015 to 2:00 p.m. Monday, August 3, 2015. All lanes will be re-open Monday, August 3, 2015 at 2:00 p.m.
I-59 Southbound inside (Left) lane between the I-10/I-59 split (Mile Post 0) and just south of the I-59 Rest Area (Mile Post 1) from 7:00 p.m. Friday, July 31, 2015 to 5:00 a.m. Monday, August 3, 2015. All lanes will re-open Monday, August 3, 2015 at 5:00 a.m.
Permit/ Detour Section
One lane of traffic will remain open at all times. No oversized loads greater than 12’ wide will be allowed through the construction zone during lane closures.
Motorists wanting to utilize US 90 as a detour should be aware that there are load restrictions on the Pearl River Bridges which only allow for passenger vehicles. No larger truck traffic will be allowed.
DETOUR MAP (REVISED): LINK
DETOUR FLYER (REVISED): LINK
Posted on 7/31/15 at 11:49 am to Jimbeaux28
Check it literally right before you leave or right before you get to that area. I made that mistake last weekend. It went from clear to a parking lot in about 2 hours time.