re: Capacity of the London, 17th, and Orleans canals and pumps in NOLA

Posted on 8/18/16 at 3:16 pm to
Posted by colorchangintiger
Dan Carlin
Member since Nov 2005
30979 posts
Posted on 8/18/16 at 3:16 pm to
quote:

20,000 gpm i believe


That's really not that much.
Posted by Nado Jenkins83
Land of the Free
Member since Nov 2012
66457 posts
Posted on 8/18/16 at 3:17 pm to
quote:

comite diversion canal


where was this planned to be set?
Posted by Cdonaldson27
New Orleans
Member since Oct 2015
1084 posts
Posted on 8/18/16 at 3:19 pm to
quote:

20,000 gpm i believe


Its 20,000 cfs total for all 3
Posted by StripedSaint
Member since Jun 2011
2385 posts
Posted on 8/18/16 at 3:24 pm to
quote:

The large pumps are rated at 1,800 cfs (cubic feet per second), which translates to almost 1.2 GPM (gallons per minute). “An Olympic-size swimming pool holds 660,000 gallons,” Claxton says. “So with the 1.2 million GPM pump, you’ve got about 30 seconds to get out of that pool.” The small pumps have half the flow rate—“only” 900 cfs, or about 400,000 GPM, he adds.

LINK
Posted by Puck82
Baton Rouge
Member since Mar 2009
23951 posts
Posted on 8/18/16 at 3:25 pm to
quote:

they want to do that with the comite diversion canal but stopped construction


This construction was stopped because of Hurricane Katrina. They were in the middle of constructing it when Katrina hit. All funds were pulled to better develop New Orleans. That is a big reason why the diversion canal sits partially dug right now.
This post was edited on 8/18/16 at 3:29 pm
Posted by pjab
Member since Mar 2016
5773 posts
Posted on 8/18/16 at 3:31 pm to
Many of the raised basement homes are being converted to full height, ground level first floors. It get that it's cheap sqft to add, but many of the houses built like that took water in Katrina (edit: with minimal damage as a result of the design). The updated flood maps have x zones in raised basement neighborhoods.

We have short memories.
This post was edited on 8/18/16 at 3:33 pm
Posted by StripedSaint
Member since Jun 2011
2385 posts
Posted on 8/18/16 at 3:37 pm to
quote:

We have short memories.

True.
But from what I have seen personally, the bottom floors are being built-out to withstand minor to medium depth flooding.
Posted by Hammertime
Will trade dowsing rod for titties
Member since Jan 2012
43031 posts
Posted on 8/18/16 at 3:38 pm to
It would flood some spots, but the water would get out much quicker
Posted by Topwater Trout
Red Stick
Member since Oct 2010
70176 posts
Posted on 8/18/16 at 3:45 pm to
quote:

where was this planned to be set?



above Baker I believe. I think they had purchased all the land but stopped waiting for more funds...don't quote me on that

ETA: I should have read Pucks post
This post was edited on 8/18/16 at 3:47 pm
Posted by Nado Jenkins83
Land of the Free
Member since Nov 2012
66457 posts
Posted on 8/18/16 at 3:50 pm to
quote:

t the start of the 21st century Pumping Station 6, or the Metairie Pumping Station, astride the canal had 15 pumps capable of moving over six billion gallons of water a day through the station. Run off from substantial areas of Uptown New Orleans, Metairie, and surrounding neighborhoods drains into the canals and basins on the River side of the pumping station, which pulls the water up into the portion of the 17th Street Canal flowing into Lake Pontchartrain.


6 billion gallons a day.

4,166,000 gallons per minute between the 15 pumps

thats 277,733.33 gallons per minute. i was way off


LINK
This post was edited on 8/18/16 at 3:52 pm
Posted by Puck82
Baton Rouge
Member since Mar 2009
23951 posts
Posted on 8/18/16 at 4:04 pm to
quote:

The only portion that was really close to being complete was the Bayou Lilly Control Structure just west of highway 61 and just south of Port Hudson. If you have google earth the coordinates are 30°37'13.25" N 91°14'22.92" W


quote:

I should have read Pucks post


I bumped the Comite Diversion thread and added this. This will show you exactly where.
Posted by The Cow Goes Moo Moo
Bucktown
Member since Nov 2012
4392 posts
Posted on 8/18/16 at 4:51 pm to
Orleans will be complete early 2017 and 17th/ London late 2017. The interim pumps will remain until new stations are operational.
Posted by Puck82
Baton Rouge
Member since Mar 2009
23951 posts
Posted on 8/18/16 at 4:58 pm to
So the plan for the interim pumps is for removal? Why not leave these $30-50 million dollar pump stations in place as backup?

ETA: Doesn't Kiewit have the permanent pump station contracts? I know they did the Orleans interim and Mr. Go.
This post was edited on 8/18/16 at 5:00 pm
Posted by Nado Jenkins83
Land of the Free
Member since Nov 2012
66457 posts
Posted on 8/18/16 at 5:00 pm to
quote:

So the plan for the interim pumps is for removal? Why not leave these $30-50 million dollar pump stations in place as backup?


probably gonna sell them way below value to mississippi
Posted by KamaCausey_LSU
Member since Apr 2013
17834 posts
Posted on 8/18/16 at 5:01 pm to
quote:

Good thing would be the water doesn't sit in the homes for 2 weeks like Katrina.

Be informed before you post, there's a big arse thread on the Alligator Bayou flooding.
Water is still rising at my parents house and won't be able to go down for 2-4 weeks..........ya dick.
Posted by The Cow Goes Moo Moo
Bucktown
Member since Nov 2012
4392 posts
Posted on 8/18/16 at 5:04 pm to
Keiwit is one of the contractors in the joint venture. The old pumps will be used to at older pump stations that require maintenance.
Posted by Puck82
Baton Rouge
Member since Mar 2009
23951 posts
Posted on 8/18/16 at 5:08 pm to
quote:

probably gonna sell them way below value to mississippi


Hopefully they fixed all the issues with those MWI pumps initially installed. There is still a lot of money put into those stations besides the pumps and motors. Still have the actual structures, needle gates, field house, etc...

Fun fact. The original plan for the interim stations was to have a guy sitting onsite with a picker and that is how the gates would be raised or lowered during emergency situations. They ditched that and went with hydraulic controls.
Posted by StripedSaint
Member since Jun 2011
2385 posts
Posted on 8/18/16 at 5:08 pm to
Grow up.
first pageprev pagePage 2 of 2Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram