- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: Can someone explain the construction on I12?
Posted on 5/26/20 at 10:44 am to Golfer
Posted on 5/26/20 at 10:44 am to Golfer
quote:
Louisiana DOTD finally does something right by pre-planning for expansions when re-doing the bridges...still gets flack
I guess I just have zero faith that they will ever actually do the expansion
Posted on 5/26/20 at 11:10 am to Golfer
Louisiana DOTD should never be credited with doing something "right". They have no idea what it means to properly stagger projects so that you don't have every single significant roadway hemmed up, all at one time. That's now how you plan projects. And part of the problem is that they take the low bidder on every project with no questions asked. Even though the next highest bidder would have probably gotten the job done faster with less change orders and overall cheaper than the low bidder, go with the low bidder so you can feel like you really "saved" money. It's like needing a piece of equipment so you go to Harbor Freight to get the el cheapo $100 model that breaks on you after 3 uses rather than spending a little more on something that lasts. That's how DOTD bids projects out.
Seriously, they don't plan worth a shite. We had the least amount of traffic on the roads that I've seen in the last 40 years in the Baton Rouge area. I-10 between Highland and Hwy 73 should have been completed. Instead of being aggressive during a miracle window to get shite done, they sit on their arse and work slower. So now it looks like we're just about back to normal with traffic again, and what do you know? It looks like they still have about six months of work left (including striping and cleaning up).
Seriously, they don't plan worth a shite. We had the least amount of traffic on the roads that I've seen in the last 40 years in the Baton Rouge area. I-10 between Highland and Hwy 73 should have been completed. Instead of being aggressive during a miracle window to get shite done, they sit on their arse and work slower. So now it looks like we're just about back to normal with traffic again, and what do you know? It looks like they still have about six months of work left (including striping and cleaning up).
Posted on 5/26/20 at 11:11 am to c on z
quote:
Someone has not been paying attention to I-10 construction in East Texas.
Under construction for almost 15 years I believe. From state line to Beaumont
Posted on 5/26/20 at 11:13 am to RealityTiger
I know a couple of people that work for DOTD. I am not shock one bit that their projects are screwed up.
Posted on 5/26/20 at 11:16 am to thadcastle
The long term plan is to 6 lane I-12 the whole way from BR to Slidell. The random work they’ve been doing through Livingston Parish is widening bridges and exits so that when they get the funds to continue the widening it’ll be quicker and easier to do without having to work on any bridges and exits.
Posted on 5/26/20 at 11:16 am to FightingTigers138
quote:to hell with that. I have triple A. If I get a flat in parking lot or at my house yeah I will change it. But if I get one on the interstate there no way I am changing one on the side of the road with way ppl drive around here.
I've dreamed of getting a flat and being able to change it in that huge shoulder
Posted on 5/26/20 at 11:26 am to The Boat
quote:
he long term plan is to 6 lane I-12 the whole way from BR to Slidell
They just started on the Northshore portions. But, the order of priority still seems confusing (starting first between the 59 and 190 exits, then moving West). I don't think that area ever backs up, NOLA commuters aren't taking the Causeway to Slidell. Madisonville to 190 is the traffic jam.