Started By
Message

re: Facilities built/renovated since 2008, Alleva's 1st year

Posted on 12/13/17 at 4:03 pm to
Posted by TigersOfGeauxld
Just across the water...
Member since Aug 2009
25057 posts
Posted on 12/13/17 at 4:03 pm to
quote:

....doesn't mean alleva didn't tweak them, etc.


Alleva rejected the original SEZ expansion plans and sent the architects back to the drawing board because he didn't want to do road work.

The new tennis center had a very different design and was supposed to go off campus. Alleva had it redesigned to fit on campus.

Nearly if not everything built during his tenure as AD has his stamp on it. And that's been a good thing.

quote:

Furthermore, these things have waayy more to do with TAF than the AD


If that were true no school would bother with having AD's.

Bottom line is every facility on campus has been improved by Joe Alleva. No facility moreso than Tiger Stadium.
first pageprev pagePage 4 of 4Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram