Started By
Message

re: Old Bumsteer's location: what are they building?

Posted on 7/21/23 at 1:32 pm to
Posted by TackySweater
Member since Dec 2020
11942 posts
Posted on 7/21/23 at 1:32 pm to
quote:

Not sure the owners attempted any legitimate marketing or creativity. I also vaguely remember the point of sale system being jacked up between first and second floors.


I feel like that chef has been involved in a lot of failed concepts, sadly.
Posted by CBandits82
Lurker since May 2008
Member since May 2012
54148 posts
Posted on 7/21/23 at 4:19 pm to
quote:

Are they going to have frites and handhelds as well?

Posted by tigers1956
baton rouge
Member since Oct 2008
4791 posts
Posted on 7/21/23 at 7:18 pm to
Interstate 10 and city park lake will be completed before this place is finished and opened….is the legislature the contractor on this slow moving project…..
We might even have a new bridge and a loop before it ever opens….
Posted by weadjust
Member since Aug 2012
15126 posts
Posted on 7/21/23 at 7:50 pm to
quote:

a very heavy bar program


Fat girls drink free
Posted by Nation of Buga
Sandy Eggo
Member since Aug 2014
2156 posts
Posted on 12/30/23 at 1:13 pm to
Is this place ever going to open? Haven’t seen anyone working on it in months.
Posted by fallguy_1978
Best States #50
Member since Feb 2018
48642 posts
Posted on 12/30/23 at 1:15 pm to
quote:

The money spent on the build outs of this building over the past 5 years is crazy to me.

It's a cool location if someone can find the right business for it.
Posted by LouisianaLady
Member since Mar 2009
81217 posts
Posted on 12/30/23 at 3:31 pm to
quote:

Is this place ever going to open? Haven’t seen anyone working on it in months.



We say that every time we pass. It is moving so slowly.

I noticed they stopped working for a long time, but then they started working on it again for a while. Now it's back to nothing.

Meanwhile Zippy's construction next door is moving lightning fast.
Posted by tigers1956
baton rouge
Member since Oct 2008
4791 posts
Posted on 12/30/23 at 6:34 pm to
New bridge will open before this place does
Posted by BilbeauTBaggins
probably stuck in traffic
Member since May 2021
4507 posts
Posted on 1/2/24 at 1:28 pm to
Sounds like a good cashflow problem for Zippy's and a bad cashflow problem for the other.
Posted by hubertcumberdale
Member since Nov 2009
6525 posts
Posted on 1/2/24 at 1:30 pm to
quote:

We say that every time we pass. It is moving so slowly.

I noticed they stopped working for a long time, but then they started working on it again for a while. Now it's back to nothing.


i went to BLDG5 for lunch on Friday and that (old bumsteers location) building looked just about the same as it did this summer, wonder if whoever building it ran out of cash
This post was edited on 1/2/24 at 1:31 pm
first pageprev pagePage 2 of 2Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram