Started By
Message

re: Metal Building Recommendations

Posted on 3/23/20 at 1:09 pm to
Posted by LegendInMyMind
Member since Apr 2019
54784 posts
Posted on 3/23/20 at 1:09 pm to
We built one around 12 years ago. We got good a price from a steel truss company who had the building up in less than two days (some time between days for concrete work and curing). I saw the receipts a few weeks back when going through some paperwork, but can't recall the exact cost.
Fast forward 8 years, and we had gotten an Amish guy to build us a 12×32 portable building for a work area and storage. The guy does great work and beats most any portable building price. Our plan was to build a lean-to on one side of the building, partially closed in, for lawn mower storage and whatnot. I drew up what I wanted, and gave it to the folks who built our metal building. The quote they gave me was outrageous. I didn't even attempt to extrapolate out to what my metal building would cost. In just 8 years time, the cost skyrocketed, especially considering the size/scope of the build.
I bought some used trusses, and have most of what I need to build the lean-to, but haven't gotten around to it.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram