Started By
Message

re: BR City Park Lakes cleanup announcement

Posted on 11/13/19 at 3:57 pm to
Posted by ashy larry
Marcy Projects
Member since Mar 2010
5568 posts
Posted on 11/13/19 at 3:57 pm to
quote:

Damn yall are an angry bunch when you dont have a clue whats going on... If, at minimum, you actually look at the sketch of the plans, you would be able to tell that these plans arent just there to get rid of weeds. They are building what looks to be bridges, connecting some of the lakes, walking paths, green spaces, and a bunch of other things. It actually looks pretty cool and should be a nice addition.



ain't nobody got time for that. This involves JBE and SWB. Only downvotes and criticism are allowed. A similar project could happen in St. George with different names attached and this would be 20 pages of jerking off the parties heroically involved.
Posted by seeinspots
Baton Rouge
Member since Apr 2014
1101 posts
Posted on 11/13/19 at 6:56 pm to
quote:

This involves JBE and SWB. Only downvotes and criticism are allowed. A similar project could happen in St. George with different names attached and this would be 20 pages of jerking off the parties heroically involved.

A whole lot of this. Not long ago some STG hero floated a plan to put hiking biking trails on the Amite dividing Ascension/Livingston/StG and the overwhelming majority of idiots on this site rubber stamped the idea. Idiots.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram