re: MSY Flyover Ramp to become first diverging diamond Interchange in Louisiana

Posted on 6/19/19 at 2:38 pm to
Posted by LSUFanHouston
NOLA
Member since Jul 2009
37167 posts
Posted on 6/19/19 at 2:38 pm to
I'm guessing the diverging diamond is for Loyola traffic onto the interstate? (Edit: Now that I see pics of this, I get it)

If there is a direct connector off ramp from 10 West to the airport, and from the airport to 10 East, then I'm confused as to why we really need a diverging diamond on Loyola, as most of the traffic will be on the direct connector ramps.

quote:

construction is anticipated to begin in early 2020, with an estimated completion of mid to late 2023.


How is it even possible that this will take 3.5 years? 20 miles of the Katy Freeway, including two MASSIVE interchanges at the beltway and 610, were totally rebuilt, feeder roads and all, in 6 years.

Are they only working 4 hours a day, 5 days a week, and taking summers off?
This post was edited on 6/19/19 at 2:42 pm
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram