Started By
Message

re: Custom millworks rec needed

Posted on 7/26/17 at 11:17 pm to
Posted by sleepytime
Member since Feb 2014
3595 posts
Posted on 7/26/17 at 11:17 pm to
Having them routed out was about 1/4 the price of having new ones made and would have been a lot faster if the cabinet shops weren't so busy.
Posted by Capital Cajun
Over Yonder
Member since Aug 2007
5528 posts
Posted on 7/27/17 at 6:12 am to
quote:

Having them routed out was about 1/4 the price of having new ones made and would have been a lot faster if the cabinet shops weren't so busy.
.

Well, you have been waiting for 6 weeks so routing being a lot faster was not the case.

The construction industry is in a boom right now so to find someone to stop production on major work to route out 20 drawer fronts may be an uphill climb.

Good luck to you but I'd just buy new fronts and be done with it.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram