Started By
Message

re: With the hiring of Wade, its time the PMac is replaced as well

Posted on 3/21/17 at 11:12 am to
Posted by CP3forMVP
Member since Nov 2010
14980 posts
Posted on 3/21/17 at 11:12 am to
I don't think fixing the PMAC would be that much of an issue. Start with the number of seats, do you really need 13,000 seats? Pull the seats out, make the seating arrangement sit a little more on top of the court, add some courtside seating, etc.

Fix the knee issue. It's very uncomfortable for someone like myself who is on the taller side. Nearly impossible to let someone get out of the row.

Have some premium seating, maybe the "premium" seats could be a little more spacious in terms of foot space and just the seats being wider in general. Cup holders obviously.

I'd also like to see them do something with the outdated doors in the concourse. Make it to where you can see the court from the concourse.
Posted by Slippy
Across the rivah
Member since Aug 2005
6624 posts
Posted on 3/21/17 at 11:33 am to
I'm not sure there is much than can do about the configuration of the bowl. This is a poured-in-place structure, with concrete rows of a certain depth. To get more knee room, they would need to create deeper rows. How would that be done? Can the whole setup be demo'd and re-poured? I don't know. Need architects or engineers to chime in.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram