Started By
Message

re: Bayou chene barge

Posted on 5/19/11 at 3:18 pm to
Posted by poule deau
Member since Jan 2009
1408 posts
Posted on 5/19/11 at 3:18 pm to
quote:

JulianD


FB blocked at work.

Details?
Posted by AlxTgr
Kyre Banorg
Member since Oct 2003
81956 posts
Posted on 5/19/11 at 3:20 pm to
quote:

Details?



quote:

A single sheet of sheet pile failed on the Bayou Chene project. T Baker Smith is working on remediation of the single sheet to repair or replace. This does not equate to totally system failure. Water elevation pass the Bayou Chene project is approximately 18-24” lower than before the project structure. Any additional questions please contact St. Mary Levee District office at 985-330-5500.


Posted by JulianD
Member since May 2011
49 posts
Posted on 5/19/11 at 3:21 pm to
Press release from St Mary Levee District. One section of sheet pile collapsed, engineering firm T Booker Smith going to repair or replace.

If it fails under the conditions before the water arrives...
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram