re: Good news, the Bluebonnet overlay work should be completed by Feb 2026

Posted on 4/17/24 at 8:53 pm to
Posted by Shorts Guy
BR
Member since Dec 2023
43 posts
Posted on 4/17/24 at 8:53 pm to
quote:

Yeah they are taking their sweet time with this. Are they replacing the curb or something? I know drainage was shite.


God I hope they fix the drainage. That Nicholson asphalt was only 12 years old when it had to be ripped up. I remember commuting on it when it was being re-done back in 2010. That’s practically brand new by Louisiana standards. It’s a good bet the standing water issue caused it to age faster.
Posted by Schmelly
Member since Jan 2014
14533 posts
Posted on 4/18/24 at 7:12 am to
quote:

God I hope they fix the drainage. That Nicholson asphalt was only 12 years old when it had to be ripped up. I remember commuting on it when it was being re-done back in 2010. That’s practically brand new by Louisiana standards. It’s a good bet the standing water issue caused it to age faster.


Nope, no drainage fixing. Just adjusting catch basins back to grade. There’s a little drainage going in at the end where it meets airline but that’s it
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram