re: Good news, the Bluebonnet overlay work should be completed by Feb 2026

Posted on 4/17/24 at 1:54 pm to
Posted by Indefatigable
Member since Jan 2019
27313 posts
Posted on 4/17/24 at 1:54 pm to
quote:

I know the Jefferson project involves the replacement of at least some of the roadbed. And of course it's concrete so they patch it before they overlay with asphalt. But it seems like they've been at it for a year by now.

A competent entity could create a two mile road out of a patch of wilderness in less than two years.

The timeline is absurd. Which particular contractor is getting rich off change orders on this?
Posted by BugAC
St. George
Member since Oct 2007
53076 posts
Posted on 4/17/24 at 7:41 pm to
quote:

competent entity could create a two mile road out of a patch of wilderness in less than two years.


Depends on the owner and how good the drawings are.

quote:

Which particular contractor is getting rich off change orders on this?


Not the contractors fault the owner doesn’t do their due diligence.
Posted by Shorts Guy
BR
Member since Dec 2023
43 posts
Posted on 4/17/24 at 8:56 pm to
quote:

A competent entity could create a two mile road out of a patch of wilderness in less than two years.


This actually tends to be a lot easier than rebuilding an existing, heavily used and developed thoroughfare. Assuming the terrain isn’t something crazy.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram