Started By
Message

re: CP3 Bay Boat Re-Wire w/ Pics

Posted on 3/3/24 at 5:30 pm to
Posted by Capt ST
Hotel California
Member since Aug 2011
12930 posts
Posted on 3/3/24 at 5:30 pm to
He does beautiful work.
Posted by thejudge
Westlake, LA
Member since Sep 2009
14134 posts
Posted on 3/3/24 at 5:33 pm to
I love that work.

As a former tech all my boxes and cabinets looked like that when completed.

CP3 has a lot of pride and is shows. Great job. I can really appreciate all aspects of that rewire.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram