Started By
Message

re: Update pg 3 - 43" bar information home assistant display now in beta!

Posted on 11/16/26 at 3:16 pm to
Posted by CAD703X
Liberty Island
Member since Jul 2008
95392 posts
Posted on 11/16/26 at 3:16 pm to
quote:

When are we getting an update on the castle install? I want to see some screen recordings.


running a bit behind schedule but he still doesn't have electricity yet so there's no immediate rush. took the time to overhaul my local system so it looks as close to his as possible to minimize issues he may experience (proxmox containers and lxcs, omada network, technitium dns settings, NAS setups, VPN, UPS configurations, etc.) which honestly will pay off in the long run and i have the time to mess with it right now, find issues, and refine the run-book for when i'm onsite. everything is staging as a series of proxmox scripts so its super easy to run them one after another once i've perfected the scripts. ran into a million paper cuts which would have sucked all the time out of my on-site visit. i don't have time to hang around with this many systems so i need everything to work the first time.

deploy will be gradual:

* finish networking cabling & low voltage runs for LED light wired eyeballs and leak sensors
* bring NAS and Dell onsite and power them up and configure Omada
* do what smart doodad config i have time for while onsite, but finish that remotely. he can hit a 'pair' button on a zwave doodad and i can tunnel into his HAOS to add it.
* his dell will push the tv station to *his* miniPC but its still living at my house so he wont see anything until i'm ready for the grand unveiling which will be a separate trip once everything is configured. this is PERFECT because i was worried about how much would break once i went from 'simulated' dashboard to actually working with the actual live dash. will run the whole TV schedule on my bar display before we bring the miniPC on site.

* stair LED projects will happen later; we decided to keep the wood scrap treads in place on the stairs right now and not put the final ones in until everyone is done trudging up and down the stairs with heavy shite. that buys us time to focus on the stairs.

* final project (for now) will be the outdoor lights & turret lights.

* extra credit - LEDs on the spiral staircase but thats after the dust settles on the rest of the project.

eta he's playing with the electrical line thats about to be attached to his house. he's as big of a kid as i am.

This post was edited on 11/16/26 at 3:34 pm
Jump to page
Page First 13 14 15
Jump to page
first pageprev pagePage 15 of 15Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

Facebook•X•Instagram