Started By
Message
locked post

A few questions...

Posted on 7/13/10 at 9:25 am
Posted by CalcuttaTigah
Member since Jul 2009
906 posts
Posted on 7/13/10 at 9:25 am
1) Do we know when the integrity tests will begin? I suppose we are just waiting on a few preparations and the green light...?

2)Are there still minor leaks in the sea floor and what are their plans for addressing this issue if so...
Posted by MountainTiger
The foot of Mt. Belzoni
Member since Dec 2008
14854 posts
Posted on 7/13/10 at 2:39 pm to
1) Sometime today. Some have reported that the flow looks diminished so they may have already started.

2) That's what the integrity test is supposed to determine. If the well doesn't hold pressure, then they will open the stack back up and ramp up production.
Posted by CalcuttaTigah
Member since Jul 2009
906 posts
Posted on 7/13/10 at 3:02 pm to
Ramp up production meaning...More skimmers????
Posted by jeff967
Monroe, Louisiana
Member since Jan 2010
925 posts
Posted on 7/13/10 at 3:05 pm to
quote:

Ramp up production

let more oil ans gass go to the drill ships
Posted by MountainTiger
The foot of Mt. Belzoni
Member since Dec 2008
14854 posts
Posted on 7/13/10 at 3:07 pm to
quote:

Ramp up production

Add more production capacity to collect more hydrocarbons.
Posted by back9Tiger
Mandeville, LA.
Member since Nov 2005
16446 posts
Posted on 7/13/10 at 3:55 pm to
They will use the new pipes to pump oil to more vessels at the surface if the pressure does not hold or shows to do more damage sub surface.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram