- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: When pouring a slab....
Posted on 9/14/17 at 2:35 pm to ourkansastigah
Posted on 9/14/17 at 2:35 pm to ourkansastigah
What happens if the slope is zero? Can you skim with extra concrete years after to increase slope?
Posted on 9/14/17 at 2:52 pm to Quinn225
quote:
Can you skim with extra concrete years after to increase slope?
No. There most likely would not have enough depth to effective build up the "top coat." Meaning it would flake off. A coating could be an option but it would be epoxy based and not cementious.
Posted on 9/14/17 at 2:56 pm to Quinn225
quote:
What happens if the slope is zero? Can you skim with extra concrete years after to increase slope
Yes, there is usually a couple inch step down from the slab. You should be able to build it up on the high side and slope it. I would read the manufacturer recommended thickness for both maximum and minimum. I would use an epoxy product.
Popular
Back to top

3





