Started By
Message

re: (METAIRIE, La) Scaffold-building crew injured when metal meets high-voltage power lines

Posted on 4/19/18 at 9:41 pm to
Posted by SuddenJerk
Member since Oct 2017
727 posts
Posted on 4/19/18 at 9:41 pm to
I drove past that shite today and saw all the cops and news crews out there and was thankful I was going the opposite direction. I didn’t know what exactly was going on, but my first thought was there might have been a jumper lol. Yeah I watch too much tv.
Posted by RealityTiger
Geismar, LA
Member since Jan 2010
20443 posts
Posted on 4/19/18 at 9:44 pm to
quote:

they had been assured by Entergy and the hotel that the power had been cut so that the renovation could continue.
That feeder should have been locked out with a lock and chain, and a 2nd more experienced worker to verify that the feeder was de-energized. If this is not SOP with Entergy for a situation like this, it should be.

I know one thing. Whoever said the line was de-energized needs to be fired tomorrow morning.
Posted by tgrbaitn08
Member since Dec 2007
146214 posts
Posted on 4/19/18 at 9:48 pm to
quote:

Empire Scaffolding...


Just to think, I was fishing down in Empire just last week.

Counting my blessings
Posted by BowDownToLSU
Livingston louisiana
Member since Feb 2010
19250 posts
Posted on 4/19/18 at 9:56 pm to
I see a lot of jokes . I have a lot of friends over the years that are scaffold builders. Hopefully nobody was hurt to bad
Posted by Chad504boy
4 posts
Member since Feb 2005
166226 posts
Posted on 4/19/18 at 10:07 pm to
Lines were supposed to be shut off weren’t.

Worker on ground got shocked the worst, 3rd degree burns. Was touching scaffolding and was grounded. Took a bad lick but looks like he’s pretty fortunate considering
This post was edited on 4/19/18 at 10:07 pm
Posted by chalupa
Member since Jan 2011
6756 posts
Posted on 4/19/18 at 10:13 pm to
quote:

they had been assured by Entergy and the hotel that the power had been cut so that the renovation could continue


They are about to be some rich mofos.
Posted by Vise
Louisiana
Member since Sep 2013
294 posts
Posted on 4/20/18 at 1:15 am to
Empire Scaffold doesn’t exist anymore, and hasn’t for quite a few years.

And yes, they all refused to build the scaffold previously bc of the lines. And yes, they were assured by multiple parties that the power was cut.
This post was edited on 4/20/18 at 1:18 am
Posted by Miketheseventh
Member since Dec 2017
5725 posts
Posted on 4/20/18 at 1:41 am to
Entergy will not be in the wrong because some dumb arse built a scaffold to close to energized power lines
Posted by BHM
Member since Jun 2012
3148 posts
Posted on 4/20/18 at 1:53 am to
quote:

Entergy will not be in the wrong because some dumb arse built a scaffold to close to energized power lines



Did you even read this thread?
Posted by bbrownso
Member since Mar 2008
8985 posts
Posted on 4/20/18 at 6:44 am to
And just when we're supposed to have Entergy cut its rates due to the tax cuts.

Now we'll see a W.M.L. Recovery Fee on our bills for the next 20 years.

W.M.L. = Worker Mistake Lawsuit
Posted by DawgGONIT
Member since May 2015
2961 posts
Posted on 4/20/18 at 7:56 am to
Captilism baby!


frick the safety of some low paying scrubs, as the finishing of construction is all that matters. Gotta keep them profits rolling in.

:usa:
first pageprev pagePage 2 of 2Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram