- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Coaching Changes
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: BR DOTD did something right
Posted on 4/8/20 at 8:23 pm to HeadSlash
Posted on 4/8/20 at 8:23 pm to HeadSlash
quote:
and good weather.
Forgot that point.
I just wish the experts at DOTD or their contractor that is working on some intersection improvements in South Lafourche area on 3235 would have used some better judgments in rerouting traffic for their new J-Turn improvements.
Instead of building the new J-turns first they just closed the intersection and the future relocated J-Turn crossover intersections.
All that they did was push the traffic that needs to turn on 3235 to other more dangerous crossovers until they finish the project.
And I don't know what they are planning in Larose at the intersection by Rouses. It looks like they want to create some cross overs and add acceleration and deceleration lanes using the extra space that is there for the future new bridge over the Intracostal. It is a mess out there, but luckily with the less traffic load, it is not that bad.
I probably could have saved DOTD from having to do all of this construction if instead of J-Turns restripe the road to narrow the traffic down to 1 lane at those intersections to create the acceleration and deceleration lanes in the same road footprint.
Mississippi did this on MS 607 near the Rest stop by the Louisiana state line.
Posted on 4/8/20 at 8:28 pm to Tshiz
Just glad they were able to do the work during this weird economic shutdown.
Posted on 4/8/20 at 9:14 pm to philly444
quote:
Sooo is anyone gonna disclose the name of the contractor?
Don’t know who it is
Posted on 4/8/20 at 9:25 pm to Tshiz
This is from the DOTD website:
LA 427: La 3064 - Acadian Thruway (Rt Ii)
H.013331.6-R1 - Concrete pavement rehab-grinding/dowell retrofit/should drain install
Proj. Engr: Sam, Desmond
Route: LA 42
Contractor: Hard Rock Construction LLC
Miles: 3.17
Work Order Date 2020-02-15 Contract Amount $3,783,975
Estimated Completion Date - Beginning of 2021
LA 427: La 3064 - Acadian Thruway (Rt Ii)
H.013331.6-R1 - Concrete pavement rehab-grinding/dowell retrofit/should drain install
Proj. Engr: Sam, Desmond
Route: LA 42
Contractor: Hard Rock Construction LLC
Miles: 3.17
Work Order Date 2020-02-15 Contract Amount $3,783,975
Estimated Completion Date - Beginning of 2021
Posted on 4/8/20 at 9:28 pm to rasczak
That's not a Texas contractor.
Posted on 4/8/20 at 9:29 pm to doubleb
It’s Hardrock out of New Orleans. They are usually pretty good
Posted on 4/8/20 at 9:30 pm to Tshiz
The baws working on 183 in ATX kicked arse on the new toll portion of it
Posted on 4/8/20 at 9:32 pm to Triggerr
Did the build the hard rock cafe
Posted on 4/8/20 at 9:32 pm to Triggerr
quote:
It’s Hardrock out of New Orleans. They are usually pretty good
Years ago they did the Coursey/Sherwood intersection during Kip’s Greenlight Plan.
They did great.
Posted on 4/8/20 at 9:51 pm to Tshiz
Low bid laws govern.
They didn’t select them on qualifications.....
They didn’t select them on qualifications.....