Started By
Message

re: Now it's Government Street's turn with awful drainage issues.

Posted on 9/16/21 at 3:02 pm to
Posted by doubleb
Baton Rouge
Member since Aug 2006
36380 posts
Posted on 9/16/21 at 3:02 pm to
quote:

Did they pour asphalt IN the storm drain?



That’s standard procedure in EBR. It flies down the water and allows silt to build up. That way thd weeds have time to root and grow. As the weeds grow more trash and silt collects and then you get a curb inlet functions at 25% capacity.

I think there’s a detail of how to do it on every EBR road project.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram