Started By
Message

re: Someone in Lake Charles got a pretty sick looking patio built * Update from owner pg 13 *

Posted on 6/12/21 at 4:45 pm to
Posted by gumbeaux
Member since Jun 2004
4484 posts
Posted on 6/12/21 at 4:45 pm to
There is no way that the 2” thick concrete overlay simply poured on top of the old slab would have bonded to the old concrete. The welded wire fabric laying on top of the old slab wasn’t going to do crap. The new concrete would have cracked and spalled in no time.

The same can be said for the welded wire fabric laying on the ground for the new addition. It would have not added any structural integrity nor prevented any cracking..
Posted by stout
Smoking Crack with Hunter Biden
Member since Sep 2006
167886 posts
Posted on 6/12/21 at 4:50 pm to
quote:

The welded wire fabric laying on top of the old slab wasn’t going to do crap


Agreed. It would have laid on the bottom doing nothing. No room to even put stands on it or pull it up to the center as they poured. I bet Trevor also tried to save a few bucks and didn't even have the concrete company add fiber to the mix.

first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram