Started By
Message

re: Someone in Lake Charles got a pretty sick looking patio built * Update from owner pg 13 *

Posted on 6/8/21 at 1:41 pm to
Posted by meaux5
New York, NY
Member since Sep 2010
11011 posts
Posted on 6/8/21 at 1:41 pm to
yeah this is confusing.
Did this guy have two separate contracts? One for labor, one for materials? Or one contract and the guy subcontracted the labor out?

Posted by stout
Smoking Crack with Hunter Biden
Member since Sep 2006
167538 posts
Posted on 6/8/21 at 1:44 pm to
quote:

yeah this is confusing.
Did this guy have two separate contracts? One for labor, one for materials? Or one contract and the guy subcontracted the labor out?



It doesn't matter. He clearly acted as the GC either way. Some people think they can skirt the system by having you pay the "subs" directly. He rolled his profit into material cost and would also probably take a cut from the sub. The law and the contractor board will not care as it's obvious he was acting in the capacity of a GC.

If I send a sub to do work for someone I usually do it as a favor and stay out of it 100%. Of course, I only send someone I would trust.
Posted by jchamil
Member since Nov 2009
16567 posts
Posted on 6/8/21 at 1:44 pm to
quote:

Did this guy have two separate contracts? One for labor, one for materials? Or one contract and the guy subcontracted the labor out?



I think the contractor is just an idiot and thinks he isn't responsible because he had a sub do the concrete work
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram