re: Tellurian: A Potential Hundred Bagger?

Posted on 2/25/22 at 11:29 am to
Posted by Zissou
Member since Jun 2012
289 posts
Posted on 2/25/22 at 11:29 am to
I've been involved with the LNG build down in Cameron. That facility is smaller than Driftwood, and took 3 years to go from swamp to producing LNG. So Driftwood may take 4-5 years for construction.

Starting construction in April may mean building access roads, perimeter controls, bush hogging, etc. Those actions show progress and keep permits active, but may not be 100 bulldozers moving dirt. Time will tell.

I'm in though. They are hiring for management positions now. I think it gets built.
Posted by Texas Tea 123
Member since Sep 2017
210 posts
Posted on 2/25/22 at 5:34 pm to
I'm just curious, why does everyone on this thread think this will facility will get built with adequate commercial contracts?

I'm not taking either side, I'm just curious why there is so much conviction (other than the obvious bias of owning shares..)

"Because they're starting construction" is not an answer, Charif has done far more reckless things.
This post was edited on 2/25/22 at 5:36 pm
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram