Democrat failure will happen everywhere as it happens currently in Cali:

LA Times:

State bullet train delays ‘beyond comprehension,’ contractor says in blistering letter

A letter from a major contractor blames the state for delays in building the bullet train, saying it has not been provided land it needs to work on. (California High Speed Rail Authority)

By RALPH VARTABEDIAN
JAN. 12, 2021 5 AM PT
One of the state’s top bullet train contractors has sent a scorching 36-page letter to California high-speed rail officials, contradicting state claims that the line’s construction pace is on target and warning the project could miss a key 2022 federal deadline.

The letter, obtained by The Times, alleges that a multitude of problems have remained unresolved for years, including rapid turnover of state officials, continuing delays in obtaining land for the rail and the state’s failure to secure agreements with outside parties, including utilities and freight railroads. The delays will result in idled work sites and layoffs of field workers, says the letter, by construction giant Tutor Perini.

As of mid-November, construction teams can not build on more than 500 parcels in the Fresno area because the California High Speed Rail Authority still lacks possession or proper documentation, according to the Jan. 4 letter. The company has completed all the work that could be done efficiently and as a result is now operating at other sites at a slower pace.

“It is beyond comprehension that as of this day, more than two thousand and six hundred calendar days after [official approval to start construction] that the authority has not obtained all of the right of way…” wrote Tutor Perini Vice President of Operations Ghassan Ariqat to Garth Fernandez, the contracting chief at the state rail authority.

Ariqat said his company “anticipates that it will have to lay off a significant number of its field workers in the very near future” and that it has already let 73 field workers go in recent weeks.

The conditions described by the letter jeopardize the project’s long-range goals, because it is already struggling to complete even a portion of its original vision of a Los Angeles-to-San Francisco bullet train. The letter indicates that delays and cost overruns are poised to grow worse.

In response, rail authority Chief Executive Brian Kelly essentially dismissed the letter, saying in a statement that it “attempts to set out why project challenges are everybody else’s fault.”





500 PARCELS THAT CANT BE BUILT ON? JEEEESUS! and the Democrat in charge lies like a dog
Posted by Figgy
CenCal
Member since May 2020
7241 posts
Posted on 2/16/21 at 9:55 am to
I live in Fresno. High Speed Rail sucks. It’s a visual blight. It’s extraordinarily slow to be built even where they have the okay to build. We’ve got to be close to 7 or 8 years from when they first broke ground and they still haven’t completed it through the city proper. We”re talking like a 10 mile stretch on flat land alongside a freeway. No hills, valleys or mountains to get in the way. Just existing property that needed demolishing. That’s about as positive as I can be about this boondoggle. If you get into what the state was sold on the cost and see where it is now.. then the moral side of using eminent domain to take private property.. it’s government at its worst. Which is truly angering.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram