Started By
Message

re: Update Page5: Got my shed! I paid some MS baw to build a shed and now he’s ghosting me

Posted on 5/6/20 at 8:52 am to
Posted by Giantkiller
the internet.
Member since Sep 2007
20660 posts
Posted on 5/6/20 at 8:52 am to
quote:

Why do people keep paying contractors in advance? WHY?!


I work for a subcontractor. I wonder if next time I'm awarded a job, I can just go ahead and bill for some of it before it even starts.
Posted by CE Tiger
Metairie
Member since Jan 2008
41587 posts
Posted on 5/6/20 at 8:56 am to
quote:

Why do people keep paying contractors in advance? WHY?!


i’m doing a six figure renovation and this is the only contractor i’ve had an issue with. it was a material deposit. in hindsight yea i’m an idiot but dude came to my house we talked about the job picked out materials and i cut him the check
Posted by TexasTiger90
Rocky Mountain High
Member since Jul 2014
3576 posts
Posted on 5/6/20 at 9:26 am to
quote:

I work for a subcontractor. I wonder if next time I'm awarded a job, I can just go ahead and bill for some of it before it even starts.

Front load your cashflow baw
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram