re: Bernhard says he will finance loan for new Mississippi River Bridge in Baton Rouge

Posted on 12/7/18 at 2:21 pm to
Posted by GeauxPack81
Member since Dec 2009
10485 posts
Posted on 12/7/18 at 2:21 pm to
There are 3 projects that are the same, on a list of like 50...

$142 million out of over a billion
Posted by CrazyTigerFan
Osaka
Member since Nov 2003
3317 posts
Posted on 12/7/18 at 3:05 pm to
You're only looking at a list of 2018-2019 GL-1 projects that are funded, not the entire list of GL-1 projects. Only two of the bullet points on the MoveBR figure are not on the list of Green Light Plan projects (or were not at some point in time).

MoveBR is essentially the same bill of goods as the Green Light Plan extension that failed. That doesn't necessarily make it a bad plan, but it's disingenuous to pretend that it's a completely new package.
Posted by doubleb
Baton Rouge
Member since Aug 2006
36534 posts
Posted on 12/7/18 at 3:10 pm to
quote:

There are 3 projects that are the same, on a list of like 50...
WRONG
Mc Hugh Road 8 million
(2) Hooper Road jobs 50 million
Jones Creek(modified) 19 million
(2) Old Hammond jobs 48.9 M
Perkins Road 26.2 Million
Nicholson to Brightside/Lee 21M
Pecue interchange 52 Million
Picardy/Perkins conn 40 MM

quote]
$142 million out of over a billion
[/quote]
WRONG 265.10 Million out of the 805.5Million dollars of proposed projects or 33%.

If you add in all the enhancements, sidewalks, traffic lights, bike paths, synchronization, etc. then it's 24% of the entire plan, but do we know if all the bike path, sidewalk, enhancements and synchronization projects in GL1 were all finished? We do not.

I'm seeing one out of four dollars of this tax going to complete GL1 projects.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram