re: Travers Mackel reporting NOLA has halted the Boubon Street construction project

Posted on 8/17/17 at 5:42 pm to
Posted by TimeOutdoors
AK
Member since Sep 2014
12130 posts
Posted on 8/17/17 at 5:42 pm to
quote:

They need to charge that company everyday this shite ain't done on time.


The company that didn't even bid on the project because the City decided to illegally award it to their maintenance contractor to keep from having to go out to bid? If you thought the stormwater pumps story or the statues were going to be the most embarrassing story out of N.O. this year...just wait.
Posted by Martini
Near Athens
Member since Mar 2005
48887 posts
Posted on 8/17/17 at 5:50 pm to
quote:

quote:
They need to charge that company everyday this shite ain't done on time.


The company that didn't even bid on the project because the City decided to illegally award it to their maintenance contractor to keep from having to go out to bid? If you thought the stormwater pumps story or the statues were going to be the most embarrassing story out of N.O. this year...just wait.


The contract will have liquidated damages but no way they would run into them with weather and adverse conditions.

And it's not the contractor but the city that would be responsible if it was an illegal contract.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram