- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: Ot engineers/construction guys
Posted on 6/21/16 at 3:02 pm to Boudreaux35
Posted on 6/21/16 at 3:02 pm to Boudreaux35
quote:
Only difference I could see is cover is the distance between the surface of the concrete and the near face of the bar. Clearance is distance between bar faces.
This is 100% correct. ACI requires minimum clearance between reinforcing members. I think its 2" or 2x bar diameter whatever is greater.
Not exactly sure on requirements of cover but its similar to clearance.
This post was edited on 6/21/16 at 3:04 pm
Posted on 6/21/16 at 3:09 pm to finfeathersport
how does corrosion control come into play with clearance? or does it at all?
Posted on 6/21/16 at 3:22 pm to finfeathersport
quote:
This is 100% correct. ACI requires minimum clearance between reinforcing members
Except for bundle bars on bridge decks.
The tolerances are almost always identical, unless if you have partially formed surfaces and cast directly on the ground, and possibly on elevated decks.
I only brought it up because of a debate at work.
Popular
Back to top
Follow TigerDroppings for LSU Football News